Ethiopia close to finishing 70% of Grand Ethiopian Renaissance Dam

Ahmed Abbas
2 Min Read
A picture taken on May 28, 2013 shows the Blue Nile in Guba, Ethiopia (AFP File Photo)

Ethiopia is about to finish 70% of construction of the Grand Ethiopian Renaissance Dam (GERD), minister of the Ethiopian Government Communication Affairs office Getachew Reda said.

In an interview with the Saudi newspaper Al-Sharq Al-Awsat, Reda added that the finished work included civil engineering and water engineering.

Egypt, Ethiopia, and Sudan have contracted two French companies to prepare a report on the impact of the dam on the three countries.

Reda said that the technical report has nothing to do with the current construction and it is only meant to show its impact on other countries.

“The dam is being built and this will not be affected by the report, but if there is anyone who believes that he would affected after carrying out the study, then it is not our problem in Ethiopia,” Reda said.

The GERD has strained relations between Ethiopia and Egypt since construction began in 2011, with relations reaching their lowest point in 2013.

Members of the tripartite committee of the GERD are preparing to present their final review of the technical studies on the construction of the dam to the water ministers of the three countries.

Last December, Egypt, Ethiopia, and Sudan signed the Khartoum Document, addressing the ways to enforce and execute the declaration of principles singed by the presidents of the three countries last March.

Share This Article
Follow:
Ahmed Abbas is a journalist at DNE’s politics section. He previously worked as Egypt based reporter for Correspondents.org, and interned as a broadcast journalist at Deutsche Welle TV in Berlin. Abbas is a fellow of Salzburg Academy of Media and Global Change. He holds a Master’s Degree of Journalism and New Media from Jordan Media Institute. He was awarded by the ICFJ for best public service reporting in 2013, and by the German foreign office for best feature in 2014.