Prime Minister Mostafa Madbouly toured Beni Suef governorate on Saturday, visiting an air-conditioner compressor plant built by El Araby Group with Taiwan’s Rechi, a Korean-owned textile factory and a station on the high-speed electric rail network.
Compressor plant
The tour opened at the Compra factory at El Araby Group’s industrial complex in the governorate.
Abdelrahman Salah El Araby, Compra’s managing director, said the plant would be built in two phases. The first, on 15,000 square metres, has capacity of 1.5 million compressors a year and employs about 300 people, with 35% of output using energy-saving inverter technology and 20% earmarked for export. The second phase will expand the site to 25,000 square metres and lift capacity to 4.5 million units a year, with about 500 jobs, 65% of output in inverter models and 38% for export.
The factory produces rotary compressors using R32 and R290, refrigerant gases with a lower environmental impact.
Feng Ming-fa, Rechi’s president and managing director, said the first phase brings assembly technology to Egypt, while the second will add technology for making the primary components. He said he hoped the plant could begin exporting compressors from Egypt within three years.
Mohamed El Araby, chief executive of El Araby Group, said the group aimed to build a base for components and inputs alongside finished appliances, to raise local content. Industry Minister Khaled Hashem said the project would reduce reliance on imports of a key appliance component.
Korean textile plant
Madbouly also visited the South Korean-owned textile factory Lee Hwa Egypt in the Kom Abu Radi industrial zone in Al-Wasta, which produces raw, dyed and finished polyester fabrics. The plant, which started operating in 2020 on about 40,000 square metres, represents Korean investment of $150m and employs about 455 people. It has capacity of about 13,000 linear metres of fabric and 6,291 tonnes of undyed synthetic fibre fabric, and exports some of its output to the UAE.
High-speed rail station
The prime minister then inspected the Fayoum/Beni Suef station on the high-speed electric train network, accompanied by Transport Minister Kamel Al-Wazir, Fayoum Governor Mohamed Hany and Beni Suef Governor Abdallah Abdel Aziz.
The station, at Demo in Fayoum governorate, will serve both governorates. It lies on the network’s second line, which runs about 1,148 km from 6th of October City towards Upper Egypt, with a design speed of about 250 km/h. The line will connect with the first line at Hadayek October station and with the third line at Qena.